Key Risk Indicators: 60+ Examples by Risk Category and Industry (2026)

October 25, 2026

Most articles on key risk indicators stop at the definition. This one is the library: the indicators practitioners actually put on dashboards in regulated firms, grouped first by risk category and then by sector, each with a metric definition, example threshold logic and the system the number normally comes from.

If you are new to the concept, read how to define, monitor and act on KRIs first. This article assumes you know what a KRI is and need to choose some.

How to read the tables

Every row has four parts:

  • Metric definition — the exact calculation. Half of all KRI disputes are two people computing "the same" indicator differently.
  • Threshold logic — illustrative green / amber / red bands. They are starting points for calibration, not benchmarks; the firm's own history and risk appetite decide the real numbers.
  • Data source — where the figure comes from without manual effort. A KRI nobody can produce monthly without a spreadsheet exercise will be abandoned within two quarters.
  • Lead or lag — whether the indicator warns before the loss (leading) or confirms it afterwards (lagging). A good set has both; a set that is all lagging is a loss report with colours. Most rows below are leading indicators of control health; the regulatory ratios are lagging by construction.
KRI anatomy: leading vs lagging, and what each threshold band obliges
Leading indicators (cause or precondition)Overdue reviews · patch lag · alert backlog · key-role vacancies · untested controls. Noisier, but they move first.
Lagging indicators (consequence)Losses booked · breaches reported · complaints · capital and liquidity ratios. Reliable, but after the fact.
GreenWithin appetite — monitor on the normal cycle
AmberBuffer below the limit — owner investigates, reports to committee
RedAt or beyond the limit — escalate to a named forum within set days

KRI examples by risk category

Credit risk

KRIMetric definitionGreen / Amber / RedData source
Watch-list exposureExposure on internal watch list ÷ total credit exposure< 5% / 5–10% / > 10%Credit system, monthly
Stage 2 migration rateNew IFRS 9 Stage 2 balances in period ÷ opening performing book< 1% / 1–3% / > 3%Provisioning engine
Single-name concentrationLargest group exposure ÷ eligible capital< 10% / 10–20% / > 20% (large-exposure limit is 25%)Exposure aggregation
30-day arrears roll rateAccounts moving from current to 30+ days past due ÷ current accounts< 0.5% / 0.5–1.5% / > 1.5%Collections system
Unwaived covenant breachesFacilities with a covenant breach not formally waived0 / 1–2 / 3+Covenant monitoring log
Collateral revaluation lagSecured exposures with a valuation older than policy allows ÷ secured exposures< 5% / 5–15% / > 15%Collateral register

Market risk

KRIMetric definitionGreen / Amber / RedData source
VaR limit utilisation1-day 99% VaR ÷ approved VaR limit< 70% / 70–90% / > 90%Risk engine, daily
Backtesting exceptionsDays in the trailing 250 where actual loss exceeded VaR≤ 4 / 5–9 / ≥ 10 (Basel traffic-light zones)Risk engine vs P&L
Net open FX positionSum of net open positions by currency ÷ own funds< 5% / 5–10% / > 10%Treasury system
EVE sensitivityChange in economic value of equity under ±200bp ÷ Tier 1 capital< 10% / 10–15% / > 15% (supervisory outlier test)ALM model, quarterly
Stale pricesPositions priced from a quote older than 5 business days ÷ total positions< 1% / 1–3% / > 3%Valuation control

Liquidity risk

KRIMetric definitionGreen / Amber / RedData source
Liquidity coverage ratioHigh-quality liquid assets ÷ 30-day net stressed outflows> 130% / 110–130% / < 110% (floor 100%)Regulatory reporting
Survival horizonDays until the liquidity buffer is exhausted under the firm's severe stress> 90 / 30–90 / < 30ALM stress model
Depositor concentrationTop-10 depositors ÷ total deposits< 15% / 15–25% / > 25%Core banking
Intraday buffer usagePeak intraday overdraft or collateral use ÷ available intraday liquidity< 50% / 50–80% / > 80%Nostro monitoring
Asset encumbranceEncumbered assets ÷ total assets< 15% / 15–25% / > 25%Treasury

Operational risk

KRIMetric definitionGreen / Amber / RedData source
Operational loss vs budgetYear-to-date gross operational losses ÷ pro-rated annual loss budget< 80% / 80–110% / > 110%Loss event database
Near-miss ratioNear misses reported ÷ (near misses + loss events)> 60% / 40–60% / < 40% — a low ratio means people stopped reportingIncident register
Overdue control testsControl tests past due date ÷ tests scheduled< 5% / 5–15% / > 15%Controls module
Aged reconciliation breaksOpen reconciling items older than 5 business days0–5 / 6–20 / > 20 itemsReconciliation tool
Overdue high-severity audit findingsHigh-rated findings past their agreed closure date0 / 1–2 / 3+Audit tracking
Undocumented manual workaroundsCritical processes relying on a manual step with no written procedure0 / 1–3 / > 3Process inventory

IT and cyber risk

KRIMetric definitionGreen / Amber / RedData source
Critical patch lagMean days from vendor release to deployment for critical CVEs on internet-facing systems< 7 / 7–14 / > 14 daysVulnerability scanner
Phishing click rateUsers clicking in simulated phishing ÷ users tested< 3% / 3–8% / > 8%Awareness platform
MFA coverageAccounts with MFA enforced ÷ accounts with remote or privileged access100% / 97–99% / < 97%Identity provider
Unrecertified privileged accountsPrivileged accounts not reviewed within 90 days0 / 1–5 / > 5IAM access review
End-of-life systemsProduction systems past vendor support with no approved exception0 / 1–2 / 3+CMDB
Backup restore test failuresFailed or untested restores of Tier 1 systems in the quarter0 / 1 / 2+Backup tooling, test log
Critical system downtimeUnplanned minutes of Tier 1 unavailability per month< 30 / 30–120 / > 120Monitoring, incident tool

Third-party and outsourcing risk (DORA, EBA outsourcing guidelines)

KRIMetric definitionGreen / Amber / RedData source
Critical providers without a tested exit planProviders supporting critical or important functions with no exit plan tested in 24 months0 / 1 / 2+Third-party register
Overdue due-diligence reviewsCritical providers whose periodic assessment is past due ÷ critical providers0% / 1–10% / > 10%Third-party module
Provider SLA breachesMaterial SLA breaches by critical providers in the quarter0 / 1–2 / 3+Vendor performance reports
Provider concentrationCritical or important functions dependent on one provider or cloud region ÷ all such functions< 25% / 25–40% / > 40%Register of information
Unnotified sub-outsourcingSub-contractors supporting critical functions discovered without prior notification0 / 1 / 2+Contract reviews, attestations
Register of information completenessMandatory DORA register fields populated ÷ required fields100% / 95–99% / < 95%Register of information

Compliance and AML

KRIMetric definitionGreen / Amber / RedData source
Overdue periodic KYC reviewsClients past their risk-based review date ÷ active clients< 2% / 2–5% / > 5%Onboarding system
Alert backlog aged 30+ daysTransaction-monitoring alerts open more than 30 days0 / 1–25 / > 25Monitoring system
Suspicious-report filing timeMedian business days from internal escalation to filing with the FIU< 5 / 5–10 / > 10Compliance case log
High-risk client shareHigh-risk and PEP relationships ÷ active clientsBoard appetite band, e.g. < 10% / 10–15% / > 15%Client risk rating
Unresolved screening hitsSanctions or adverse-media hits open more than 2 business days0 / 1–5 / > 5Screening tool
Mandatory training completionStaff completing AML and conduct training by deadline ÷ staff required100% / 95–99% / < 95%Learning system
Regulatory breaches notifiedBreaches notified to the regulator in the rolling 12 months0 / 1 / 2+Breach register

People and HR risk

KRIMetric definitionGreen / Amber / RedData source
Key-role turnoverVoluntary leavers in designated key roles ÷ key-role headcount, rolling 12 months< 10% / 10–20% / > 20%HR system
Critical vacancy durationDays a control-function or licensed role has been vacant< 30 / 30–90 / > 90HR system, recruitment
Single points of failureCritical activities with only one trained person0 / 1–3 / > 3Skills matrix
Overdue mandatory trainingStaff with any mandatory module overdue ÷ headcount< 3% / 3–10% / > 10%Learning system
Whistleblowing and grievance volumeCases opened in the quarter per 100 staffTrend-based: a sustained zero is amber, a step change is redCase management
Sustained overtimeStaff averaging more than 10 overtime hours a week for 8+ weeks0 / 1–5 / > 5Time recording

Strategic risk

KRIMetric definitionGreen / Amber / RedData source
Client revenue concentrationTop-3 clients ÷ total revenue< 25% / 25–40% / > 40%Finance
Budget varianceActual vs budgeted operating result, year to datewithin 5% / 5–15% / > 15% adverseFinance
Strategic project slippageBoard-sponsored initiatives more than one quarter behind baseline ÷ initiatives0% / 1–25% / > 25%Portfolio tracker
Client attritionClients lost in the trailing 12 months ÷ opening client count< 5% / 5–10% / > 10%CRM
Overdue product reviewsLive products whose post-launch review is past due0 / 1–2 / 3+Product governance log

ESG and climate risk

KRIMetric definitionGreen / Amber / RedData source
Emissions vs pathwayScope 1 and 2 tCO2e year to date ÷ transition-plan trajectory≤ 100% / 100–110% / > 110%Sustainability data
Transition-sensitive exposureLending or investments in high-transition-risk sectors ÷ portfolioAppetite band, e.g. < 10% / 10–20% / > 20%Portfolio tagging
Physical-risk asset shareCollateral or own assets in high flood, heat or wildfire zones ÷ total< 5% / 5–15% / > 15%Geospatial overlay
ESG data coverageCounterparties or holdings with verified ESG data ÷ total> 90% / 70–90% / < 70%Data vendor, own collection
Reporting datapoint readinessRequired CSRD/ESRS datapoints with a named owner and a source ÷ required100% / 85–99% / < 85%ESG reporting module

KRI examples by industry

The category tables apply everywhere. The sector tables add the indicators a supervisor in that sector will expect to see on your dashboard.

Banks

KRIMetric definitionGreen / Amber / RedData source
CET1 headroomCET1 ratio minus overall capital requirement including Pillar 2 guidance> 300bp / 150–300bp / < 150bpRegulatory reporting
Loan-to-deposit ratioNet loans ÷ customer deposits< 90% / 90–110% / > 110%Core banking
Cost of riskAnnualised impairment charge ÷ average gross loanswithin plan / plan + 25bp / plan + 50bpFinance
Complaints per 1,000 accountsComplaints received in the quarter ÷ active accounts × 1,000Trend-based: 20% quarterly rise is amber, a regulator-escalated complaint is redComplaints system

Insurers (Solvency II)

KRIMetric definitionGreen / Amber / RedData source
SCR coverage ratioEligible own funds ÷ Solvency Capital Requirement> 160% / 130–160% / < 130% (floor 100%)Solvency II model
Combined ratio(Claims + expenses) ÷ earned premium< 95% / 95–100% / > 100%Actuarial, finance
Prior-year reserve developmentMovement in prior-year claims reserves ÷ opening reservesRelease or < 2% strengthening / 2–5% / > 5% strengtheningReserving
Reinsurer concentrationRecoverables from the largest reinsurer ÷ own funds< 20% / 20–35% / > 35%Reinsurance system
Lapse ratePolicies lapsed in period ÷ policies in force, annualisedwithin pricing assumption / + 2 points / + 5 pointsPolicy administration

Investment firms (MiFID II, IFR/IFD, ICARA)

KRIMetric definitionGreen / Amber / RedData source
Own-funds headroomOwn funds ÷ the higher of fixed-overhead, permanent-minimum and K-factor requirement> 150% / 120–150% / < 120%ICARA, regulatory reporting
Client-money reconciliation differencesUnexplained differences in the daily internal client-money reconciliation0 / resolved within 1 day / unresolved after 1 dayClient-money reconciliation
Best-execution exceptionsOrders flagged outside tolerance by execution monitoring ÷ orders sampled< 1% / 1–3% / > 3%Execution monitoring
Suitability file exceptionsAdvised or managed accounts with incomplete or stale suitability assessment ÷ accounts< 2% / 2–5% / > 5%Periodic review workflow
Wind-down trigger proximityLiquid resources ÷ wind-down cost estimate from the ICARA> 150% / 110–150% / < 110%ICARA

Payment and e-money institutions

KRIMetric definitionGreen / Amber / RedData source
Safeguarding reconciliation gapRelevant funds owed to customers minus safeguarded balance0 / shortfall covered same day / shortfall carried overnightSafeguarding reconciliation
Fraud rateValue of fraudulent transactions ÷ total transaction value, in basis points< 5bp / 5–13bp / > 13bp (13bp is the PSD2 reference rate for the lowest exemption band)Fraud monitoring
Chargeback ratioChargebacks ÷ transactions, monthly, per card scheme< 0.5% / 0.5–0.9% / > 0.9% (scheme monitoring programmes start near 1%)Acquirer, scheme reports
Authorisation success rateApproved authorisations ÷ attempted> 95% / 90–95% / < 90%Processing platform
Monitoring alert backlogTransaction-monitoring alerts unactioned after 5 business days0 / 1–50 / > 50Monitoring system

Fund managers (AIFMD, UCITS)

KRIMetric definitionGreen / Amber / RedData source
NAV errorsPricing errors above the materiality threshold in the quarter0 / 1 / 2+, or any requiring investor compensationFund administrator
Liquidity mismatchDays to liquidate 50% of the portfolio under stress vs redemption notice periodwithin notice period / up to 2× / > 2×Liquidity model
Investment restriction breachesBreaches of prospectus or regulatory limits in the quarter0 / 1–2 passive / any active breachPre- and post-trade compliance
Leverage vs limitCommitment-method leverage ÷ disclosed maximum< 70% / 70–90% / > 90%Risk system
Depositary queries outstandingDepositary oversight queries open more than 10 business days0 / 1–3 / > 3Depositary correspondence log

Fiduciary and corporate service providers

KRIMetric definitionGreen / Amber / RedData source
Overdue client file reviewsClient structures past their annual or risk-based review date ÷ active structures< 3% / 3–10% / > 10%Client administration system
Incomplete beneficial ownershipStructures where UBO identification or verification is incomplete0 / 1–5 / > 5KYC records
Missed statutory deadlinesAnnual returns, financial statements, FATCA/CRS or UBO-register filings missed in the quarter0 / 1–2 / 3+Compliance calendar
Unresponsive clientsStructures where the client has not answered information requests for 90+ days ÷ structures< 2% / 2–5% / > 5%Correspondence log
Fees receivable over 90 daysReceivables aged 90+ days ÷ total receivables, a proxy for disengaged or distressed clients< 10% / 10–20% / > 20%Finance

Leading versus lagging: getting the mix right

A lagging indicator measures the consequence: losses booked, breaches reported, complaints received. It is reliable and easy to source, and it tells you nothing you could have acted on. A leading indicator measures a cause or a precondition: overdue reviews, patch lag, staff turnover, alert backlogs. It is noisier, but it moves first.

The useful question for each top risk is: what would have been visible three months before this risk crystallised? Most answers are leading indicators of control health — things being late, piling up or going untested. Pair each with one lagging indicator so you can check, after the fact, whether the leading one actually warned you. If a leading indicator has never moved before an event, replace it.

A workable ratio for a board-level set is roughly two-thirds leading, one-third lagging. Regulatory ratios (LCR, SCR coverage, own-funds headroom) are a special case: lagging in construction but carrying mandatory consequences, so they stay on the dashboard regardless.

Setting thresholds that mean something

Three methods, in order of preference:

  1. Appetite-anchored. The board has said how much of something it will tolerate — a concentration cap, a maximum loss, a minimum capital buffer. Red is the appetite limit; amber is a buffer below it that gives management time to act, typically 10–20% of the limit; green is everything else. This is the only method that makes the KRI a genuine appetite monitor.
  2. Regulatory-anchored. Where a supervisor sets a floor, red should sit above the floor, not on it. Breaching a regulatory minimum is not an early warning; it is the event. Treat the floor plus the time needed to restore it as red.
  3. History-anchored. Where neither applies, use the firm's own distribution: amber above the 75th percentile of the last 24 months, red above the 90th. Revisit after a year; percentile thresholds drift as the business grows.

Whichever method you use, write down who may change a threshold and how. A threshold a risk owner can quietly loosen the month it turns red is not a threshold. Make amber mean something specific — usually "the owner investigates and reports at the next committee" — and red mean escalation to a named forum within a defined number of days. Some indicators need two-sided thresholds: a near-miss ratio or a whistleblowing count that drops to zero is as much a warning as one that spikes.

Reporting cadence and ownership

Indicator typeMeasuredReported to
Market, liquidity, client money, safeguardingDailyTreasury or finance; breaches escalated the same day
Cyber, third-party SLAs, alert backlogs, reconciliationsWeekly or monthlyOperational risk committee
Credit, operational loss, compliance, HRMonthlyExecutive risk committee
Strategic, ESG, capital headroomQuarterlyBoard risk committee

Report trends, not points. A KRI at 8% means little; a KRI that has moved from 3% to 8% over four months while staying green is the story. Each indicator needs one accountable owner, a documented calculation, a linked risk in the risk register and a linked control where one exists, so a red light tells you which control to go and look at. A platform such as ActiveERM holds the KRI, its thresholds and its history against the risk it monitors, so the dashboard and the register move together rather than being reconciled by hand before each meeting.

Starting a KRI library

  • Start with 15–25 indicators covering the top ten risks, not 70. The tables above are a menu, not a target.
  • For every candidate, confirm somebody can produce the figure monthly from a system. If not, automate the source or drop the indicator.
  • Pilot thresholds for two quarters before presenting them to the board as final.
  • Review the whole set annually and whenever a loss event occurs that no indicator predicted. That gap is the most valuable information the programme produces.

Supervisory expectations for indicators sit inside the broader risk frameworks summarised on our risk regulations page.

Frequently asked questions

How many KRIs should a small regulated firm have?

Between 15 and 30 at board level is typical. Below that, coverage of the top risks is thin; above it, the dashboard stops being read. Operational teams can track more detailed indicators beneath them.

What is the difference between a KRI and a KPI?

A KPI measures how well an objective is being achieved; a KRI measures how likely it is that something will prevent it. Staff turnover is a KPI for HR and a KRI for operational risk — the same number, read for a different purpose. Many KRIs are KPIs with a risk threshold attached.

Should thresholds be the same across business units?

The calculation should be identical; the thresholds may differ if the units have genuinely different risk profiles and the board has accepted that. Document the reason. Unexplained differences are usually negotiation, not calibration.

How often should KRI thresholds be reviewed?

Annually as a set, plus whenever the appetite statement changes, a regulatory limit changes, or a loss event shows the indicator did not warn. Recalibrating individual thresholds more often than that usually means the indicator was poorly chosen.

Can a KRI be qualitative?

Yes, if the scoring is defined. A quarterly 1–5 assessment of the regulatory relationship, scored against written criteria, is a legitimate KRI. An unexplained "amber" from a manager is not.